Yes. Design revisions may be possible, but they require approval from the Engineering Department. Approved changes may result in additional design or construction costs.
Can I make changes after the design is complete?
Yes. Design revisions may be possible, but they require approval from the Engineering Department. Approved changes may result in additional design or construction costs.