The Agreement for Interconnection of Distributed Generation (AIDG) is a required agreement between the member and VEA.
It is sent with the final engineering invoice and must be signed, notarized, and returned before your net meter can be installed.
The Agreement for Interconnection of Distributed Generation (AIDG) is a required agreement between the member and VEA.
It is sent with the final engineering invoice and must be signed, notarized, and returned before your net meter can be installed.