Your design package should include:
- Site plan with electric locations
- Three-line electrical diagram
- Approved jurisdictional permits
- Electrical equipment details
- Production meter location
- AC disconnect
- Existing electrical panel information
- Solar equipment specifications
- Battery or generator information (if applicable)
Plans must clearly identify existing and new equipment and be approved by the appropriate Authority Having Jurisdiction (AHJ) before being submitted to VEA.
Here are some examples of specification sheets needed:
Diagram Examples
Three-Line Drawing Example