When should I apply for new electric service?

We recommend submitting your application as soon as your plans are county-approved and you know your construction timeline. Residential applications generally take 2–3 weeks to process, while larger or more complex commercial projects may require additional time.

What information is required with my application?

A complete application helps prevent delays. Depending on your project, you may need to provide:

  • County-stamped site plans
  • Building envelope and square footage
  • Structural, drainage, or landscape details
  • Utility locations (water, sewer, telecom, etc.)
  • Preferred meter location
  • Electrical load information
  • Temporary construction power needs
  • Construction schedule
  • Proof of property ownership
  • AutoCAD files (if available)

Incomplete applications cannot move into the design phase.

What happens after I submit my application?

Once your complete application is received:

  1. A work order is created.
  2. You'll receive an email confirmation with your work order number.
  3. You'll receive instructions for paying the engineering fee.

Please note that payments cannot be accepted until a work order has been issued.

How can I pay my engineering fee?

You can pay:

  • In person by cash or check
  • By credit or debit card over the phone with Member Services

Please have your applicant name, work order number, and service address available when making payment.

What happens during the design phase?

After your engineering fee is paid, your project is assigned to a Staker who will:

  • Visit your property
  • Determine the best service route
  • Design the electrical system to your meter location
  • Coordinate directly with you throughout the design process

Designs generally take 4–6 weeks, depending on project complexity.

What do I need to do before the site visit?

Before the Staker visits your property, please:

  • Mark all property corners with stakes.
  • Mark any planned grade changes.

These markers help ensure the electrical facilities are designed and installed correctly.